13 tests of shenyang.gov.cn's functioning were conducted during the 741 day period starting on November 8, 2022. A 200 status code indicated that shenyang.gov.cn was operational for the 7 time out of all assessments on November 18, 2024. 46.15% of the evaluations performed resulted in shenyang.gov.cn being inaccessible, which totals 6 events, most recently on February 12, 2023. According to the records, no error status codes were present in any of the responses that had been received as of November 18, 2024. Recorded on November 18, 2024, was a 4.112 seconds response time for shenyang.gov.cn, averaging 2.348 seconds.